Footing & Groundwork Concrete

Footings Img3

All footing and groundwork concrete is mixed on site and delivered in one of the following ways:

  1. Directly into the trench
  2. Directly into your wheelbarrows
  3. Into our concrete pump

If you are unsure about the mix required for your specific project, please contact our team who will be able to provide you with guidance on the best mix to use for your particular requirements.


Other Applications

Accumix can supply concrete for use in foundations, groundwork for houses, garages and conservatories. It can also be used for out-buildings, retaining walls and terraces. Bricks and blocks can usually be laid on the concrete just 24 hours after placing foundation concrete subject to reasonable weather conditions.

Please note: Concrete does not reach it's specification strength until 28 days after placement.

Footings Img1
  • Variety of concrete mixes to suit your needs
  • Mixed on site to ensure maximum working time
  • Designated mixes for Footings & Groundwork
  • Workability of mix controlled on site
  • All concrete supplied under BSI accreditation
Footings Img2

For further assistance call us now on Call: 01463 772600

Contact Image